WENDY by Stern Technic

The bore record for trenchless pipeline construction.

Plan, utility records, terrain elevations, machine data and photos in one record per bore – every value with its source.

WENDY by Stern Technic is the platform for trenchless pipeline construction: plan routes on the desktop and check them against DVGW GW 302 and GW 125, document the site in the site diary, collect approvals by link without an account, and run every project as a bore record – every value with its source, export to GAEB X83, IFC4 and LandXML.

  • Standards

    DVGW GW 302 · 125 · 321

    in the calculation, not the brochure

  • Terrain

    DE Google · NL AHN4

    heights per country pack: official in NL, Google in DE – source shown on every profile

  • Country packs

    DE · NL

    coordinates and height datum per country, standards named per country

  • Export

    GAEB X83 · IFC4 · LandXML

    straight into estimating, CAD and BIM

  • Manufacturer

    Stern Technic

    builds BOB itself – software and machine from one source

Your route, worked through

One route. Five stations. One bore record.

CO₂, cost, approval, BOB run: every station works with your route from the planner – and ends in the drill report.

  1. Station 1 of 5

    What your route saves in CO₂.

    Trenchless versus open trench – calculated with factors from Ökobaudat, KBOB and TEPPFA.

    Route planning and CO₂ balance for your route: WENDY places launch, exit and intermediate pits by method and shot length and plans crew and equipment travel from the depot to the site. Distance, vehicles and consumption give the diesel per working day. The CO₂ balance compares trenchless installation (HDD, mini-HDD, microtunnelling, pipe bursting, BOB, BUDDEL) with open trench: pipe production, excavator or drill rig, soil and material haulage, asphalt reinstatement and travel. For a 269 m urban HDD route, trenchless installation saves around 8 t CO₂e, about two thirds. Emission factors come from Ökobaudat, KBOB and TEPPFA EPDs; every assumption is adjustable.

  2. Station 2 of 5

    Estimate with your own rates.

    Change a rate – net total, cost per metre and construction time update instantly. One calculation, one figure.

    The WENDY cost calculator estimates your route from direct costs: daily output, crew, day rates for equipment and support equipment, pipe per metre, launch, reception and intermediate pits, site setup, transport, traffic management, survey and documentation, drilling fluid and disposal, risk allowance, and overheads and profit. Length, method and soil come from the planner; you replace every rate with your own. Net total, cost per metre and construction time in working days appear instantly – one calculation, one figure, the same as in the drill report. The comparison shows what the same route would cost and how long it would take as an open trench.

  3. Station 3 of 5

    Checked to standard, approved by you.

    Bend radius, clearance, cover and utility records – every finding blocks approval.

    Approve your plan yourself: WENDY checks your route automatically – minimum bend radius per DVGW GW 302, minimum cover, utility records and clearance to third-party lines per DVGW GW 125 – including the line's position tolerance: if the clearance only holds when the line lies exactly where the plan shows it, it counts as not reliable. This page only has an example line, so utility records and clearance are never green. A finding blocks approval until it is fixed or deliberately accepted with a written reason. You tick off the on-site checks, add a note and approve with name, role and timestamp – or reject with a reason. The approval record carries a checksum of the plan: if the route changes afterwards, the approval visibly becomes invalid.

  4. Station 4 of 5

    BOB steers around obstacles on its own.

    Contact at the cutting head (the drill head), back-up, new start in an arc – place a stone and watch.

    In the simulation BOB first runs into the stone — it has no look-ahead sensors. When vibration at the cutting head and motor load rise above the threshold, it detects the obstacle and stops advancing. Only at standstill does it reverse and back up along its own track far enough for an evasion arc to fit. It then re-sets in an arc with a lateral offset — every arc keeps the pipe's minimum bend radius to DVGW GW 302, 1.25 m for the PE-HD DN 50 cable duct. If that fails, it tries a larger offset or the other side until it is past and steers back onto the planned route. The first run uses the soil from your input; before approval every run is a trial run, not a bore. Every step is recorded with its station and sensor readings in the event log and flows into the bore record and the drill report.

  5. Station 5 of 5

    The record becomes the drill report.

    Photos, approval and BOB run at their station – as PDF or CSV, based on DVGW GW 321.

    In the bore record, WENDY files everything at its station along the route: site photos with capture time and GPS from the EXIF data, the approval note with name and timestamp, and the events of the BOB run – contact, retraction, restart, passage, target pit. Vibration at the drill head and motor load are plotted against the chainage. Anything still missing is shown as missing, never filled with a default. The result is the drill report, based on DVGW GW 321: general data, approval, every entry with timestamp and GPS position on the route axis, readings, cost and CO₂ balance. It can be downloaded as CSV or printed as PDF.

Data room

What is missing is shown as missing.

Plan, utility records, machine, sensors, photos, survey and decisions in one record – every source with provider, date and provenance.

Every value carries its provenance. The machine is one source, not a prerequisite.

Source matrix

  • Route with depthsconnected
  • Terrain elevationpresent
  • Existing utilities (inquiry)present
  • As-built handover to network operatormissing
  • Telemetry archiveconnected
  • Commands with reasonconnected
  • As-builtpresent
  • Field photospresent
  • Voice notespresent
  • GPS trailspresent
  • Soil assessmentmissing
  • Control surveymissing
  • Decision logconnected

Request a quote

Added in the product

Plan at the desk. Document on site. Approve by link.

Plan

Draw the route on the map, conflict check against existing utilities per DVGW GW 125, costing per VOB/C. The plan becomes the bill of quantities.

  • Draw the route on the map – WENDY works out length and pits
  • Conflict check against existing utilities per DVGW GW 125
  • Export: GAEB X83, IFC4, LandXML

Document

Photos with location and time and voice notes land in the site diary of the right project. On site, the mobile companion app will capture them – even without signal; it is still to follow.

Approve

Client, public authority, safety coordinator and utility owners approve via link in the browser, without a WENDY account. Every decision with timestamp, IP hash and document hash.

Capabilities

What WENDY does today.

Every statement here is built into the product. Anything not yet shipped is marked “to follow”.

WENDY Control

BOB and BUDDEL in the platform

WENDY shows live telemetry, release and safety stop of its own robots BOB and BUDDEL directly in the platform.

DVGW GW 125

Conflict check while you draw

Conflict checking against existing utilities runs live while drawing the route, deterministic per DVGW GW 125 standard – no black box, every clearance is traceable.

Export

LandXML, IFC4 and GAEB X83

Routes, elevation profiles and bills of quantities leave WENDY in standard formats that surveying, BIM and tendering can use directly: LandXML, IFC4 and GAEB X83.

Country packs

Germany and the Netherlands

Every project runs in the matching country pack: coordinate reference, height datum and utility-locate authority change with the country, and the applicable standards are named per country. Checks today follow DVGW: clearances per GW 125, minimum bend radius per GW 302 – Germany and the Netherlands today.

Data import

AI maps, a human confirms

AI-assisted data import only maps columns, it never reads values itself – every mapping needs a human’s explicit confirmation, logged with user and timestamp, before a single point is accepted.

Mobileto follow

Mobile to follow

The companion app for the site will follow. Planning, costing and documentation run on the desktop today.

Licence

One licence: WENDY ONE.

All modules, price and term by quote, net B2B – activated by Stern Technic, no auto-renewal. Included automatically with the purchase of a WENDY machine (BOB or BUDDEL).

WENDY ONE

One licence per company with all modules — planning, costing, documentation, site diary and Control.

  • All modules
  • 5 named users included, more on request
  • Unlimited projects
  • Full AI access & API
  • Control software for paired WENDY machines (BOB, BUDDEL)
  • Term of 12 or 36 months

Included automatically with the purchase of a WENDY machine (BOB or BUDDEL).

Request a quote

BUDDEL and BOB as Robot as a Service, billed per drilled metre. Request a robot

Licence in detail

Questions

Frequently asked questions

Five questions before you buy, answered briefly.

Does WENDY help with drilling documentation (DVGW GW 321)?

Yes – as a tool, not as proof of compliance. WENDY structures the drilling report modelled on DVGW GW 321 and fills it from the bore record’s data, as a structured data set rather than retyped values. Machine telemetry flows in when it is available; anything that was not measured is shown as “not assessable” and is never glossed over. Review and signature stay with the site management.

Is WENDY tied to a specific drilling machine?

No. Machine data is one source of the bore record, not a prerequisite: WENDY keeps the record even without a connected machine – with route, utility information, photos, survey and approvals. Where machine data exists, it is added: directly from the WENDY machines BOB and BUDDEL, from other equipment via data import.

What does WENDY cost?

WENDY is sold directly. There is exactly one licence: WENDY ONE — per company, with all modules and 5 named users included, for a term of 12 or 36 months. When you buy a WENDY machine (BOB or BUDDEL), WENDY ONE is included automatically; without a machine you request a quote, and Stern Technic names the price and activates your account. All prices are net (B2B). Request a quote on the pricing page or at info@sterntechnic.com.

Which methods is WENDY made for?

WENDY is built for trenchless pipeline construction. In planning you choose the method per line – HDD/directional drilling, mini-HDD, soil displacement (impact mole), microtunneling, pipe bursting, relining, ploughing, trenching and ramming, or open cut for comparison – and the calculation uses your company’s laying rates per method and diameter. The WENDY machines BOB and BUDDEL are something else: they are equipment made by Stern Technic, not a method. Their data flows straight into the bore record; data from other equipment can be imported.

Does WENDY work offline on site?

With the WENDY mobile companion app, which is still to follow. It keeps photos, voice notes and GPS trails in a queue on the device while there is no signal and sends them once a connection is back – nothing is silently dropped. Planning, calculation and documentation run in the desktop browser today and need an internet connection.

All questions and answers

Next step

Your next bore, fully documented.

We show WENDY on your project – with your routes, your standards, your country pack.

Last updated: